Best way to reset an Oracle sequence to the next value in an existing column?
Solution 1:
You can temporarily increase the cache size and do one dummy select and then reset the cache size back to 1. So for example
ALTER SEQUENCE mysequence INCREMENT BY 100;
select mysequence.nextval from dual;
ALTER SEQUENCE mysequence INCREMENT BY 1;
Solution 2:
In my case I have a sequence called PS_LOG_SEQ
which had a LAST_NUMBER = 3920
.
I then imported some data from PROD
to my local machine and inserted into the PS_LOG
table. Production data had more than 20000
rows with the latest LOG_ID (primary key) being 20070. After importing I tried to insert new rows in this table but when saving I got an exception like this one:
ORA-00001: unique constraint (LOG.PS_LOG_PK) violated
Surely this has to do with the Sequence PS_LOG_SEQ
associated with the PS_LOG
table. The LAST_NUMBER
was colliding with data I imported which had already used the next ID value from the PS_LOG_SEQ
.
To solve that I used this command to update the sequence to the latest \ max(LOG_ID)
+ 1:
alter sequence PS_LOG_SEQ restart start with 20071;
This command reset the LAST_NUMBER
value and I could then insert new rows into the table. No more collision. :)
Note: this alter sequence
command is new in Oracle 12c.
Note: this blog post
documents the ALTER SEQUENCE RESTART option does exist, but as of 18c, is not documented. Its apparently intended for internal Oracle use.
Solution 3:
These two procedures let me reset the sequence and reset the sequence based on data in a table (apologies for the coding conventions used by this client):
CREATE OR REPLACE PROCEDURE SET_SEQ_TO(p_name IN VARCHAR2, p_val IN NUMBER)
AS
l_num NUMBER;
BEGIN
EXECUTE IMMEDIATE 'select ' || p_name || '.nextval from dual' INTO l_num;
-- Added check for 0 to avoid "ORA-04002: INCREMENT must be a non-zero integer"
IF (p_val - l_num - 1) != 0
THEN
EXECUTE IMMEDIATE 'alter sequence ' || p_name || ' increment by ' || (p_val - l_num - 1) || ' minvalue 0';
END IF;
EXECUTE IMMEDIATE 'select ' || p_name || '.nextval from dual' INTO l_num;
EXECUTE IMMEDIATE 'alter sequence ' || p_name || ' increment by 1 ';
DBMS_OUTPUT.put_line('Sequence ' || p_name || ' is now at ' || p_val);
END;
CREATE OR REPLACE PROCEDURE SET_SEQ_TO_DATA(seq_name IN VARCHAR2, table_name IN VARCHAR2, col_name IN VARCHAR2)
AS
nextnum NUMBER;
BEGIN
EXECUTE IMMEDIATE 'SELECT MAX(' || col_name || ') + 1 AS n FROM ' || table_name INTO nextnum;
SET_SEQ_TO(seq_name, nextnum);
END;
Solution 4:
If you can count on having a period of time where the table is in a stable state with no new inserts going on, this should do it (untested):
DECLARE
last_used NUMBER;
curr_seq NUMBER;
BEGIN
SELECT MAX(pk_val) INTO last_used FROM your_table;
LOOP
SELECT your_seq.NEXTVAL INTO curr_seq FROM dual;
IF curr_seq >= last_used THEN EXIT;
END IF;
END LOOP;
END;
This enables you to get the sequence back in sync with the table, without dropping/recreating/re-granting the sequence. It also uses no DDL, so no implicit commits are performed. Of course, you're going to have to hunt down and slap the folks who insist on not using the sequence to populate the column...
Solution 5:
With oracle 10.2g:
select level, sequence.NEXTVAL
from dual
connect by level <= (select max(pk) from tbl);
will set the current sequence value to the max(pk) of your table (i.e. the next call to NEXTVAL will give you the right result); if you use Toad, press F5 to run the statement, not F9, which pages the output (thus stopping the increment after, usually, 500 rows). Good side: this solution is only DML, not DDL. Only SQL and no PL-SQL. Bad side : this solution prints max(pk) rows of output, i.e. is usually slower than the ALTER SEQUENCE solution.