For workdays, Monday to Friday, you can do it with a single SELECT, like this:
DECLARE @StartDate DATETIME
DECLARE @EndDate DATETIME
SET @StartDate = '2008/10/01'
SET @EndDate = '2008/10/31'
SELECT
(DATEDIFF(dd, @StartDate, @EndDate) + 1)
-(DATEDIFF(wk, @StartDate, @EndDate) * 2)
-(CASE WHEN DATENAME(dw, @StartDate) = 'Sunday' THEN 1 ELSE 0 END)
-(CASE WHEN DATENAME(dw, @EndDate) = 'Saturday' THEN 1 ELSE 0 END)
If you want to include holidays, you have to work it out a bit...
Solution 2:
In Calculating Work Days you can find a good article about this subject, but as you can see it is not that advanced.
--Changing current database to the Master database allows function to be shared by everyone.
USE MASTER
GO
--If the function already exists, drop it.
IF EXISTS
(
SELECT *
FROM dbo.SYSOBJECTS
WHERE ID = OBJECT_ID(N'[dbo].[fn_WorkDays]')
AND XType IN (N'FN', N'IF', N'TF')
)
DROP FUNCTION [dbo].[fn_WorkDays]
GO
CREATE FUNCTION dbo.fn_WorkDays
--Presets
--Define the input parameters (OK if reversed by mistake).
(
@StartDate DATETIME,
@EndDate DATETIME = NULL --@EndDate replaced by @StartDate when DEFAULTed
)
--Define the output data type.
RETURNS INT
AS
--Calculate the RETURN of the function.
BEGIN
--Declare local variables
--Temporarily holds @EndDate during date reversal.
DECLARE @Swap DATETIME
--If the Start Date is null, return a NULL and exit.
IF @StartDate IS NULL
RETURN NULL
--If the End Date is null, populate with Start Date value so will have two dates (required by DATEDIFF below).
IF @EndDate IS NULL
SELECT @EndDate = @StartDate
--Strip the time element from both dates (just to be safe) by converting to whole days and back to a date.
--Usually faster than CONVERT.
--0 is a date (01/01/1900 00:00:00.000)
SELECT @StartDate = DATEADD(dd,DATEDIFF(dd,0,@StartDate), 0),
@EndDate = DATEADD(dd,DATEDIFF(dd,0,@EndDate) , 0)
--If the inputs are in the wrong order, reverse them.
IF @StartDate > @EndDate
SELECT @Swap = @EndDate,
@EndDate = @StartDate,
@StartDate = @Swap
--Calculate and return the number of workdays using the input parameters.
--This is the meat of the function.
--This is really just one formula with a couple of parts that are listed on separate lines for documentation purposes.
RETURN (
SELECT
--Start with total number of days including weekends
(DATEDIFF(dd,@StartDate, @EndDate)+1)
--Subtact 2 days for each full weekend
-(DATEDIFF(wk,@StartDate, @EndDate)*2)
--If StartDate is a Sunday, Subtract 1
-(CASE WHEN DATENAME(dw, @StartDate) = 'Sunday'
THEN 1
ELSE 0
END)
--If EndDate is a Saturday, Subtract 1
-(CASE WHEN DATENAME(dw, @EndDate) = 'Saturday'
THEN 1
ELSE 0
END)
)
END
GO
If you need to use a custom calendar, you might need to add some checks and some parameters. Hopefully it will provide a good starting point.
Solution 3:
All Credit to Bogdan Maxim & Peter Mortensen. This is their post, I just added holidays to the function (This assumes you have a table "tblHolidays" with a datetime field "HolDate".
--Changing current database to the Master database allows function to be shared by everyone.
USE MASTER
GO
--If the function already exists, drop it.
IF EXISTS
(
SELECT *
FROM dbo.SYSOBJECTS
WHERE ID = OBJECT_ID(N'[dbo].[fn_WorkDays]')
AND XType IN (N'FN', N'IF', N'TF')
)
DROP FUNCTION [dbo].[fn_WorkDays]
GO
CREATE FUNCTION dbo.fn_WorkDays
--Presets
--Define the input parameters (OK if reversed by mistake).
(
@StartDate DATETIME,
@EndDate DATETIME = NULL --@EndDate replaced by @StartDate when DEFAULTed
)
--Define the output data type.
RETURNS INT
AS
--Calculate the RETURN of the function.
BEGIN
--Declare local variables
--Temporarily holds @EndDate during date reversal.
DECLARE @Swap DATETIME
--If the Start Date is null, return a NULL and exit.
IF @StartDate IS NULL
RETURN NULL
--If the End Date is null, populate with Start Date value so will have two dates (required by DATEDIFF below).
IF @EndDate IS NULL
SELECT @EndDate = @StartDate
--Strip the time element from both dates (just to be safe) by converting to whole days and back to a date.
--Usually faster than CONVERT.
--0 is a date (01/01/1900 00:00:00.000)
SELECT @StartDate = DATEADD(dd,DATEDIFF(dd,0,@StartDate), 0),
@EndDate = DATEADD(dd,DATEDIFF(dd,0,@EndDate) , 0)
--If the inputs are in the wrong order, reverse them.
IF @StartDate > @EndDate
SELECT @Swap = @EndDate,
@EndDate = @StartDate,
@StartDate = @Swap
--Calculate and return the number of workdays using the input parameters.
--This is the meat of the function.
--This is really just one formula with a couple of parts that are listed on separate lines for documentation purposes.
RETURN (
SELECT
--Start with total number of days including weekends
(DATEDIFF(dd,@StartDate, @EndDate)+1)
--Subtact 2 days for each full weekend
-(DATEDIFF(wk,@StartDate, @EndDate)*2)
--If StartDate is a Sunday, Subtract 1
-(CASE WHEN DATENAME(dw, @StartDate) = 'Sunday'
THEN 1
ELSE 0
END)
--If EndDate is a Saturday, Subtract 1
-(CASE WHEN DATENAME(dw, @EndDate) = 'Saturday'
THEN 1
ELSE 0
END)
--Subtract all holidays
-(Select Count(*) from [DB04\DB04].[Gateway].[dbo].[tblHolidays]
where [HolDate] between @StartDate and @EndDate )
)
END
GO
-- Test Script
/*
declare @EndDate datetime= dateadd(m,2,getdate())
print @EndDate
select [Master].[dbo].[fn_WorkDays] (getdate(), @EndDate)
*/
Solution 4:
My version of the accepted answer as a function using DATEPART
, so I don't have to do a string comparison on the line with
DATENAME(dw, @StartDate) = 'Sunday'
Anyway, here's my business datediff function
SET ANSI_NULLS ON
GO
SET QUOTED_IDENTIFIER ON
GO
CREATE FUNCTION BDATEDIFF
(
@startdate as DATETIME,
@enddate as DATETIME
)
RETURNS INT
AS
BEGIN
DECLARE @res int
SET @res = (DATEDIFF(dd, @startdate, @enddate) + 1)
-(DATEDIFF(wk, @startdate, @enddate) * 2)
-(CASE WHEN DATEPART(dw, @startdate) = 1 THEN 1 ELSE 0 END)
-(CASE WHEN DATEPART(dw, @enddate) = 7 THEN 1 ELSE 0 END)
RETURN @res
END
GO
Solution 5:
Another approach to calculating working days is to use a WHILE loop which basically iterates through a date range and increment it by 1 whenever days are found to be within Monday – Friday. The complete script for calculating working days using the WHILE loop is shown below:
CREATE FUNCTION [dbo].[fn_GetTotalWorkingDaysUsingLoop]
(@DateFrom DATE,
@DateTo DATE
)
RETURNS INT
AS
BEGIN
DECLARE @TotWorkingDays INT= 0;
WHILE @DateFrom <= @DateTo
BEGIN
IF DATENAME(WEEKDAY, @DateFrom) IN('Monday', 'Tuesday', 'Wednesday', 'Thursday', 'Friday')
BEGIN
SET @TotWorkingDays = @TotWorkingDays + 1;
END;
SET @DateFrom = DATEADD(DAY, 1, @DateFrom);
END;
RETURN @TotWorkingDays;
END;