Count work days between two dates

Solution 1:

For workdays, Monday to Friday, you can do it with a single SELECT, like this:

DECLARE @StartDate DATETIME
DECLARE @EndDate DATETIME
SET @StartDate = '2008/10/01'
SET @EndDate = '2008/10/31'


SELECT
   (DATEDIFF(dd, @StartDate, @EndDate) + 1)
  -(DATEDIFF(wk, @StartDate, @EndDate) * 2)
  -(CASE WHEN DATENAME(dw, @StartDate) = 'Sunday' THEN 1 ELSE 0 END)
  -(CASE WHEN DATENAME(dw, @EndDate) = 'Saturday' THEN 1 ELSE 0 END)

If you want to include holidays, you have to work it out a bit...

Solution 2:

In Calculating Work Days you can find a good article about this subject, but as you can see it is not that advanced.

--Changing current database to the Master database allows function to be shared by everyone.
USE MASTER
GO
--If the function already exists, drop it.
IF EXISTS
(
    SELECT *
    FROM dbo.SYSOBJECTS
    WHERE ID = OBJECT_ID(N'[dbo].[fn_WorkDays]')
    AND XType IN (N'FN', N'IF', N'TF')
)
DROP FUNCTION [dbo].[fn_WorkDays]
GO
 CREATE FUNCTION dbo.fn_WorkDays
--Presets
--Define the input parameters (OK if reversed by mistake).
(
    @StartDate DATETIME,
    @EndDate   DATETIME = NULL --@EndDate replaced by @StartDate when DEFAULTed
)

--Define the output data type.
RETURNS INT

AS
--Calculate the RETURN of the function.
BEGIN
    --Declare local variables
    --Temporarily holds @EndDate during date reversal.
    DECLARE @Swap DATETIME

    --If the Start Date is null, return a NULL and exit.
    IF @StartDate IS NULL
        RETURN NULL

    --If the End Date is null, populate with Start Date value so will have two dates (required by DATEDIFF below).
     IF @EndDate IS NULL
        SELECT @EndDate = @StartDate

    --Strip the time element from both dates (just to be safe) by converting to whole days and back to a date.
    --Usually faster than CONVERT.
    --0 is a date (01/01/1900 00:00:00.000)
     SELECT @StartDate = DATEADD(dd,DATEDIFF(dd,0,@StartDate), 0),
            @EndDate   = DATEADD(dd,DATEDIFF(dd,0,@EndDate)  , 0)

    --If the inputs are in the wrong order, reverse them.
     IF @StartDate > @EndDate
        SELECT @Swap      = @EndDate,
               @EndDate   = @StartDate,
               @StartDate = @Swap

    --Calculate and return the number of workdays using the input parameters.
    --This is the meat of the function.
    --This is really just one formula with a couple of parts that are listed on separate lines for documentation purposes.
     RETURN (
        SELECT
        --Start with total number of days including weekends
        (DATEDIFF(dd,@StartDate, @EndDate)+1)
        --Subtact 2 days for each full weekend
        -(DATEDIFF(wk,@StartDate, @EndDate)*2)
        --If StartDate is a Sunday, Subtract 1
        -(CASE WHEN DATENAME(dw, @StartDate) = 'Sunday'
            THEN 1
            ELSE 0
        END)
        --If EndDate is a Saturday, Subtract 1
        -(CASE WHEN DATENAME(dw, @EndDate) = 'Saturday'
            THEN 1
            ELSE 0
        END)
        )
    END
GO

If you need to use a custom calendar, you might need to add some checks and some parameters. Hopefully it will provide a good starting point.

Solution 3:

All Credit to Bogdan Maxim & Peter Mortensen. This is their post, I just added holidays to the function (This assumes you have a table "tblHolidays" with a datetime field "HolDate".

--Changing current database to the Master database allows function to be shared by everyone.
USE MASTER
GO
--If the function already exists, drop it.
IF EXISTS
(
    SELECT *
    FROM dbo.SYSOBJECTS
    WHERE ID = OBJECT_ID(N'[dbo].[fn_WorkDays]')
    AND XType IN (N'FN', N'IF', N'TF')
)

DROP FUNCTION [dbo].[fn_WorkDays]
GO
 CREATE FUNCTION dbo.fn_WorkDays
--Presets
--Define the input parameters (OK if reversed by mistake).
(
    @StartDate DATETIME,
    @EndDate   DATETIME = NULL --@EndDate replaced by @StartDate when DEFAULTed
)

--Define the output data type.
RETURNS INT

AS
--Calculate the RETURN of the function.
BEGIN
    --Declare local variables
    --Temporarily holds @EndDate during date reversal.
    DECLARE @Swap DATETIME

    --If the Start Date is null, return a NULL and exit.
    IF @StartDate IS NULL
        RETURN NULL

    --If the End Date is null, populate with Start Date value so will have two dates (required by DATEDIFF below).
    IF @EndDate IS NULL
        SELECT @EndDate = @StartDate

    --Strip the time element from both dates (just to be safe) by converting to whole days and back to a date.
    --Usually faster than CONVERT.
    --0 is a date (01/01/1900 00:00:00.000)
    SELECT @StartDate = DATEADD(dd,DATEDIFF(dd,0,@StartDate), 0),
            @EndDate   = DATEADD(dd,DATEDIFF(dd,0,@EndDate)  , 0)

    --If the inputs are in the wrong order, reverse them.
    IF @StartDate > @EndDate
        SELECT @Swap      = @EndDate,
               @EndDate   = @StartDate,
               @StartDate = @Swap

    --Calculate and return the number of workdays using the input parameters.
    --This is the meat of the function.
    --This is really just one formula with a couple of parts that are listed on separate lines for documentation purposes.
    RETURN (
        SELECT
        --Start with total number of days including weekends
        (DATEDIFF(dd,@StartDate, @EndDate)+1)
        --Subtact 2 days for each full weekend
        -(DATEDIFF(wk,@StartDate, @EndDate)*2)
        --If StartDate is a Sunday, Subtract 1
        -(CASE WHEN DATENAME(dw, @StartDate) = 'Sunday'
            THEN 1
            ELSE 0
        END)
        --If EndDate is a Saturday, Subtract 1
        -(CASE WHEN DATENAME(dw, @EndDate) = 'Saturday'
            THEN 1
            ELSE 0
        END)
        --Subtract all holidays
        -(Select Count(*) from [DB04\DB04].[Gateway].[dbo].[tblHolidays]
          where  [HolDate] between @StartDate and @EndDate )
        )
    END  
GO
-- Test Script
/*
declare @EndDate datetime= dateadd(m,2,getdate())
print @EndDate
select  [Master].[dbo].[fn_WorkDays] (getdate(), @EndDate)
*/

Solution 4:

My version of the accepted answer as a function using DATEPART, so I don't have to do a string comparison on the line with

DATENAME(dw, @StartDate) = 'Sunday'

Anyway, here's my business datediff function

SET ANSI_NULLS ON
GO
SET QUOTED_IDENTIFIER ON
GO

CREATE FUNCTION BDATEDIFF
(
    @startdate as DATETIME,
    @enddate as DATETIME
)
RETURNS INT
AS
BEGIN
    DECLARE @res int

SET @res = (DATEDIFF(dd, @startdate, @enddate) + 1)
    -(DATEDIFF(wk, @startdate, @enddate) * 2)
    -(CASE WHEN DATEPART(dw, @startdate) = 1 THEN 1 ELSE 0 END)
    -(CASE WHEN DATEPART(dw, @enddate) = 7 THEN 1 ELSE 0 END)

    RETURN @res
END
GO

Solution 5:

Another approach to calculating working days is to use a WHILE loop which basically iterates through a date range and increment it by 1 whenever days are found to be within Monday – Friday. The complete script for calculating working days using the WHILE loop is shown below:

CREATE FUNCTION [dbo].[fn_GetTotalWorkingDaysUsingLoop]
(@DateFrom DATE,
@DateTo   DATE
)
RETURNS INT
AS
     BEGIN
         DECLARE @TotWorkingDays INT= 0;
         WHILE @DateFrom <= @DateTo
             BEGIN
                 IF DATENAME(WEEKDAY, @DateFrom) IN('Monday', 'Tuesday', 'Wednesday', 'Thursday', 'Friday')
                     BEGIN
                         SET @TotWorkingDays = @TotWorkingDays + 1;
                 END;
                 SET @DateFrom = DATEADD(DAY, 1, @DateFrom);
             END;
         RETURN @TotWorkingDays;
     END;
GO

Although the WHILE loop option is cleaner and uses less lines of code, it has the potential of being a performance bottleneck in your environment particularly when your date range spans across several years.

You can see more methods on how to calculate work days and hours in this article: https://www.sqlshack.com/how-to-calculate-work-days-and-hours-in-sql-server/